Before injection molding a new mold or when the machine is replaced by another mold for production, mold trial is an essential part. The result of the mold trial will directly affect the smoothness of the subsequent production of the plant. Therefore, it is necessary to follow reasonable operation steps and record the useful technical parameters during the mold trial for mass production of products.
Precautions before mold trial
1. Know the relevant information of the mould.
It is better to get the design drawing of the mold, analyze it in detail, and get the mold technician to participate in the mold test work.
2. First check the mechanical action on the working table.
To pay attention to whether there are scratches, missing parts and looseness, whether the mold to slide action is true, water and gas pipe joints have no leakage, the mold opening range if there are restrictions should also be marked on the mold. If the above actions can be done before hanging the mold, it can avoid the waste of time when hanging the mold and then disassembling the mold.
3. When the mold is determined to be suitable for each action, it is necessary to choose a suitable test
injection machine.
(a) what is the maximum injection volume of the injection molding machine
(b) whether the inner distance of the tie bar can accommodate the mold
(c) whether the maximum moving stroke of the movable template meets the requirements
(d) whether other related tools and accessories for mold testing are ready.
The next step is to hang the mold after all the problems are confirmed. When hanging, attention should be paid to not taking down the hanging before locking all the clamping plates and opening the mold, so as to avoid loosening or breaking of the clamping plates and dropping the mold. After the mold is installed, the mechanical action of each part of the mold should be carefully checked, such as the slide plate, ejector pin, retracting tooth structure and the action of the restriction switch are true. And pay attention to whether the injection nozzle and the inlet are aligned.
The next step is to pay attention to the mold closing action. At this time, the mold closing pressure should be turned down, and in the manual and low speed closing action, pay attention to see and hear whether there is any uneven action and strange sound and other phenomena. The process of lifting the mold is actually relatively simple, but the main thing that needs to be carefully done is that it is difficult to adjust the center of the mold gate and injection nozzle.
4. Increase the temperature of the mold.
According to the performance of the raw materials used in the finished product and the size of the mold, choose the appropriate mold temperature control machine to raise the temperature of the mold to the temperature required for production. After the mold temperature is raised, the action of each part must be checked again, because the steel may cause jamming after thermal expansion, so the sliding of each part must be paid attention to avoid strain and chattering.
5. If there is no experimental plan implemented in the factory, we suggest that only one condition should be adjusted at a time when adjusting the test mold conditions in order to distinguish the impact of a single condition change on the finished product.
6. Depending on the raw materials, the raw materials used should be baked appropriately.
7. Use the same raw material as much as possible for the trial mold and future mass production.
8.Don't try the mold completely with inferior material, if there is a demand for color, you can arrange the color test together.
9. Internal stress and other problems often affect the secondary processing, should be in the mold after the test to be stable after the finished product that is to be the secondary processing mold in the slow closing, to adjust the mold pressure, and action several times to see if there is uneven closing pressure and other phenomena, so as to avoid the finished product generated burr and mold deformation.
After the above steps are checked, the closing speed and closing pressure will be lowered, and the safety lever and ejector stroke will be set, and then the normal closing speed and closing speed will be adjusted. If the maximum stroke limit switch is involved, adjust the mold opening stroke slightly shorter and cut off the high-speed mold opening action before the maximum stroke. This is because the high speed action stroke is longer than the low speed one during the whole opening stroke of the mold loading. In the plastic machine mechanical ejector rod must also be adjusted after the full speed mold opening action to avoid deformation of the ejector plate or peel plate under pressure.
Before making the first mold injection, please check the following items again.
(a) Whether the material filling stroke is too long or insufficient.
(b) Whether the pressure is too high or too low.
(c) Whether the mold filling speed is too fast or too slow.
(d) Whether the processing cycle is too long or too short.
In order to prevent the finished product from short shot, breakage, deformation, burr and even injury to the mold.
If the cycle time is too short, the ejector pin will pierce the finished product or peel the ring and squeeze the finished product. This type of situation can take you two or three hours to remove the finished product. If the cycle time is too long, the weak part of the die may break due to the shrinkage of the rubber. Of course, you cannot anticipate all the problems that may occur during a mold trial, but well thought out and timely measures taken in advance will help you avoid serious and expensive losses.
Main steps of mold trial
In order to avoid unnecessary waste of time and trouble during mass production, it is indeed necessary to be patient in adjusting and controlling the various processing conditions, and to find the best temperature and pressure conditions, and to develop standard mold trial procedures that can be used to establish daily working methods.
1. Check whether the plastic material in the barrel is correct and whether it is baked according to the regulations (test mold and production are likely to yield different results if different raw materials are used).
2. Clean up the material tube thoroughly to prevent the bad plastic material or miscellaneous material from shooting into the mold, because the bad plastic material and miscellaneous material may jam the mold. Check whether the temperature of the material tube and the temperature of the mold are suitable for the processed material.
3. Adjust the pressure and shot volume to produce a satisfactory appearance of the finished product, but do not run rough edges especially when there are still some mold cavities where the finished product is not completely solidified, think before adjusting the various control conditions because a slight change in the mold filling rate may cause a large change in the mold filling.
4. Be patient and wait until the machine and mold conditions stabilize, even for medium-sized machines it may take more than 30 minutes. You can use this time to check the finished product for possible problems.
5. The screw advance time should not be shorter than the gate plastic solidification time, otherwise the weight of the finished product will be reduced and the performance of the finished product will be damaged. And when the mold is heated, the screw advance time should be extended to compact the finished product.
6. Reasonable adjustment to reduce the total processing cycle.
7. Run the new conditions for at least 30 minutes to stabilize, then produce at least one dozen full mold samples in a row, marking the date and quantity on the container and placing them separately by mold cavity to test the stability of the operation and to derive reasonable control tolerances. (Especially valuable for multi-cavity molds).
8. Measure and record the important dimensions of successive samples (should be measured when the sample has cooled to room temperature).
9. Compare the dimensions of each mold sample, noting.
(a) whether the dimensions of the product are stable.
(b) Whether there is a tendency for some dimensions to increase or decrease while the machine processing conditions are still changing, such as poor temperature control or oil pressure control.
(c) Whether the dimensional changes are within the tolerance range.
If the finished product does not vary much in size and the processing conditions are normal, observe if the quality of the finished product is acceptable and the dimensions are within tolerances for each die cavity. Note down the cavity numbers that are continuously larger or smaller than the average value in order to check the correct size of the mold.
Record the parameters obtained during the mold test.
Record and analyze the data for the purpose of modifying the mold and production conditions, and as a reference for future mass production.
1. Make the process run longer to stabilize the melt temperature and hydraulic oil temperature.
2. Adjust the machine conditions according to the oversize or undersize of all finished products, and increase the gate size for reference if the shrinkage is too large and the finished products appear to be undershot.
If the die cavity and gate size are still correct, then try to change the machine conditions, such as mold filling rate, mold temperature and pressure of each department, and check if some die cavities are slow to fill.
4. According to the finished product of each mold cavity or mold pistons shift, to be corrected, perhaps try to adjust the mold filling rate and mold temperature in order to improve its uniformity.
5. Check and modify the malfunction of the
injection machine, such as oil pump, oil valve, temperature controller, etc., will cause changes in processing conditions, even if the most perfect mold can not play a good efficiency in a poorly maintained machine. After reviewing all the recorded values, keep a set of samples to check and compare whether the corrected samples are improved.
Keep all the records of the sample inspection during the mold trial, including the processing cycle, various pressures, melt and mold temperatures, tube temperatures, injection action times, screw charging periods, etc. In short, keep all the data that will help establish the same processing conditions in the future so that you can obtain products that meet quality standards.
At present, the factory often ignore the mold temperature during the mold test, and the mold temperature is not easy to grasp during the short mold test and future mass production, and the incorrect mold temperature is enough to affect the size of the sample, light, shrinkage, flow and under material, etc., if the mold temperature controller is not used to be when the future mass production may have difficulties.
Latest blog posts
Custom molds injection molding
Custom molds injection molding is a manufacturing process that involves creating custom molds to produce plastic parts. Injection molding is a popular technique used in various industries such as...
Plastic injection molding companies
Plastic injection molding is a manufacturing process that involves injecting molten plastic into a mold to create a wide range of plastic products. From car parts to medical devices and household items, plastic injection molding is used to create a variet
PET Preform Injection Moulding Machine
PET preform injection molding is a manufacturing process that is used to create PET (polyethylene terephthalate) preforms that can be later blown into bottles, jars, and other containers. This process...
You may like
Injection Mold Design Basics
I. Plastic moulds are generally divided into (injection moulds).
1. Two-plate mold (i.e. large spout mold)
2. Three plate mold (i.e. small spout mold, fine spout, simplified type fine spout)
What are the benefits of high or low injection speed?
The most important process conditions in the injection molding process are the temperature, pressure, speed and the corresponding individual action time that affect the plasticizing...
Plastic machinery injection molding machine hydraulic fragment in the use of what to pay attention to?
1 The use of people should be clear about the principle of plastic machinery equipment plastic machine hydraulic transmission system, to understand a variety of actual operation and adjustment of the handle parts and rotation...
Analysis of the causes and countermeasures of mold sticking in the main flow channel
What is the main flow channel sticking to the mold (appearance), Main runner residue is a phenomenon that the main runner of molded products fails to break away from the mold.